The cheapest time to do low voltage work is before the walls close. This is the list we hand tenants at lease signing.

Before drywall

Pathways, conduit stubs to exterior walls, camera drops at the right heights, a home run to every future access-controlled door, and power where the rack will live. Adding a single drop later can cost ten times what it costs now.

Coordinate with the door hardware

Electrified hardware, strikes, maglocks, request-to-exit devices and fire alarm release all have to be agreed with the general contractor and the AHJ. Access control that fails an inspection is a schedule problem, not a wiring problem.

Order the circuit early

Fiber installs in older Philadelphia buildings can take weeks and occasionally months. Order the internet circuit the day the lease is signed, and plan a temporary wireless failover so the opening date does not depend on the carrier.